Featured Sidewalk Replacement
275 West 10th Street
West Village, Manhattan
Project overview
Jepol Construction renewed the sidewalk and corner approaches at 275 West 10th Street, creating clean concrete runs and accessible curb transitions around the masonry building.
The work follows two street elevations and resolves changing conditions at the building edge, curb, and crosswalk. The completed pavement provides a consistent walking surface while fitting carefully around the property's historic masonry base.
- Location
- West Village, Manhattan
- Property
- Corner property
- Services
- Sidewalk replacement
- Curb ramps
- Concrete finishing
Project scope
Completed sidewalk
New concrete extends along the building with consistent jointing and a clean transition at the masonry facade. Long views show the finished walking surface across both sides of the corner property.



Project scope
Accessible corner transitions
Corner approaches and curb ramps were shaped to connect the new sidewalk with the crosswalk and adjoining pavement. High-visibility tactile panels complete the accessible route.